What you need to know now about the new construction home buying process:
- The new construction home buying process has six stages: budgeting and pre-approval, hiring your own agent, choosing a community and build type, signing the contract and making design selections, monitoring construction through scheduled walkthroughs, and closing with a builder’s warranty in place.
- Homes built for sale, the path most Greater Memphis buyers take, now average 7.4 months from permit to completion, and the South builds faster than any other U.S. region.
- A new construction purchase runs on a different clock and a different set of documents than a resale, and skipping a step (especially independent representation) is the most common regret buyers report.
Keep reading and we’ll walk through each stage in order, including the parts most guides skip: what your earnest money actually covers, how builder warranties are structured, and what a realistic 2027 timeline looks like.
How Long Does the New Construction Home Buying Process Actually Take?

From signing a reservation agreement to picking up your keys, most Greater Memphis buyers should plan on nine to twelve months total. That includes roughly one to three months for contract and design selections, then seven to nine months of construction, based on current national data for homes built for sale.
That range is wider than most buyers expect, and it is worth sitting with before you fall deep into a floor plan search.
Why Build Times Shifted in the Last Few Years
Construction timelines spiked during supply-chain disruptions earlier this decade and have been coming back down since. According to the National Association of Home Builders’ analysis of Census Bureau construction data, the average single-family home took 8.8 months to complete in 2025, with homes built for sale finishing in 7.4 months from permit to completion. That is the fastest pace in several years.
Region matters too, and it’s worth knowing exactly where Greater Memphis falls. Shelby County, TN and DeSoto County, MS sit in the Census Bureau’s East South Central division, which averaged 9.1 months in 2025, close to the national figure and nowhere near the regional extremes. New England builders waited 13.5 months on average, while the South Atlantic division (Florida through Virginia) finished fastest at 7.6 months. Locally, expect a build timeline close to the national average rather than a dramatic regional shortcut in either direction.
What Slows a Build Down
- A custom change order submitted after framing starts
- A severe weather stretch during foundation or roofing work
- A permitting backlog at the local building department
- A material on backorder, most often cabinetry or specialty windows
- A financing delay on the buyer’s side that pushes the closing date
None of these are reasons to panic. They are reasons to build a two-to-four-week cushion into your own moving plans instead of locking in a hard date before the home is framed.
Step 1: How Do You Budget and Get Pre-Approved for a New Construction Home?

Budgeting for new construction starts the same way resale budgeting does, with a lender conversation, but new-build buyers have one extra lever: builder-affiliated financing incentives. Get pre-approved before you fall in love with a lot, and ask every builder you tour whether their in-house or preferred lender offers a rate buydown or closing-cost credit.
Calculate What You Can Actually Afford
- Pull your last two years of income documentation together before your first lender call
- Factor in your current home’s equity if you are selling to buy
- Leave room in your budget for design-center upgrades, which can add 5 to 15 percent to a base price
- Ask your lender to run numbers at both today’s rate and a half-point higher, so a rate move between contract and closing does not catch you off guard
Why Builder-Preferred Lenders Are Worth a Conversation
Builders often partner with a specific lender and offer real incentives for using them: reduced rates, covered closing costs, appliance packages. You are never required to use a builder’s preferred lender, and a competing quote from an outside lender is still smart. But dismissing the offer without comparing numbers leaves savings on the table.
A Note on Today’s Rate Environment
Mortgage rates have moved up over the second half of 2026. Freddie Mac’s Primary Mortgage Market Survey shows the 30-year fixed rate averaging 7.40 percent as of mid-October. Builder rate buydowns matter more in an environment like this one than they did when rates were lower, since even a temporary one- or two-point buydown meaningfully changes your first few years of payments.
Before you tour a single floor plan, know your real number. Run your own ballpark estimate with our free pricing tool so you walk into every conversation with a lender or builder already informed. Try our mortgage calculator →
Step 2: Do You Need Your Own Agent for a New Construction Purchase?
Yes. The agent standing in a builder’s model home represents the builder, not you, and their commission structure does not change that. Hiring your own buyer’s agent before your first site visit costs you nothing extra in most markets, since the builder typically pays the agent’s commission out of their own marketing budget.
What an Independent Agent Actually Does for You
- Reviews the builder’s purchase agreement line by line before you sign
- Flags unusual clauses, particularly around delay penalties and deposit forfeiture
- Compares the builder’s standard finishes against what competitors in the same price range include
- Represents your interests, not the builder’s, during the walkthrough and punch-list process
A recent National Association of Realtors analysis found that 61 percent of new-home buyers who purchased in the prior year used a real estate agent specifically because they wanted representation during the process, citing help spotting unnoticed faults, understanding the contract, and negotiating terms.
How to Vet a Builder Before You Commit
Ask every builder on your shortlist for a list of communities they have completed, not just the one they are currently selling. A builder with a decade-plus track record and a public portfolio of finished neighborhoods is giving you something a brand-new entrant cannot: proof.
A builder’s history tells you more than their sales pitch. See the communities we have built across Greater Memphis since 2014 and judge our work for yourself. Learn more about our history →
Step 3: How Do You Choose a Community and the Right Type of Build?
Most buyers choose between three paths: a move-in ready home already under construction, a to-be-built home where you select finishes before ground breaks, and a fully custom home on land you already own. Each has a different timeline, a different level of personalization, and a different price structure.
Move-In Ready, To-Be-Built, or Custom: What’s the Difference?
- Move-in ready (spec) homes are already under construction or finished, built on the builder’s standard plan and finish package. These close fastest, often in a matter of weeks if the home is complete.
- To-be-built homes let you choose your lot and your finishes before construction starts, inside a defined menu of floor plans and options. This is the path most Greater Memphis buyers take, and it is the one this guide focuses on.
- Fully custom homes are designed from scratch, typically on land the buyer already owns, with far more flexibility and a correspondingly longer timeline.
What to Know About Lot Premiums
Not every homesite in a community costs the same. Corner lots, cul-de-sac lots, and lots backing up to green space or water typically carry a premium above the base price, sometimes a few thousand dollars, sometimes considerably more in a highly sought-after section of a community. Walk the available lots in person before you commit. A lot premium is easier to justify in daylight than on a site plan.
Understanding HOA Fees in a New Construction Community
Most new construction communities, including the majority built across Greater Memphis, operate under a homeowners association that maintains common areas, entrances, and shared amenities. HOA dues vary by community and typically run from a few hundred to over a thousand dollars annually. Ask for the HOA’s current budget and reserve study before you sign, not after.
HOA terms are easy to skim and expensive to misunderstand. Get a plain-language breakdown of what dues typically cover and the questions worth asking before you buy. Read our full guide to HOAs →
Step 4: What Happens During the Contract and Design Selections Phase?

Once you choose a lot and a floor plan, you will sign a purchase agreement and move into the design selections phase, where you choose everything from structural options to cabinet finishes. This is also when your earnest money deposit comes due, and new construction deposit structures work differently than resale.
Earnest Money on New Construction vs. a Resale Purchase
A resale earnest money deposit is usually a small, fully refundable amount held until closing. New construction works differently, and buyers who assume the two are the same are often surprised.
| Resale Home | New Construction Home | |
|---|---|---|
| Typical deposit | 1 to 3 percent of price | Often 5 to 10 percent, sometimes paid in stages |
| When it’s due | At contract signing | At contract signing, with additional deposits at milestones like selections or framing |
| Refundability | Refundable during inspection and financing contingency periods | Often non-refundable once selections are locked in, varies by builder contract |
| What it protects | The seller, against a buyer walking away | The builder, against carrying custom selections for a buyer who backs out |
Read every deposit clause before you sign. Ask specifically what happens to your money if your financing falls through after selections are locked, since that is the scenario that catches buyers off guard most often.
Choosing Your Design Center Selections
- Structural options (extra bedroom, bumped-out garage, finished bonus room) need to be locked in first, before cosmetic choices
- Flooring, cabinetry, and countertop selections typically happen in a dedicated design center appointment
- Paint and fixture choices usually come last and are the easiest to adjust within the selections window
- Track every upgrade’s cost in writing as you go. Design center totals creep upward fast when selections happen verbally
Your floor plan is the foundation every other decision builds on. Browse our full library of available layouts before your design appointment so you walk in with a shortlist, not a blank page. Explore our floor plans →
Step 5: What Should You Expect During Construction and Walkthroughs?
Once construction starts, your role shifts from decision-maker to monitor. A responsible builder schedules you in for a handful of structured check-ins, and showing up for each one matters more than casual drive-bys.
The Three Walkthroughs That Matter Most
1. Pre-Drywall (Frame) Walk
This happens after framing, plumbing, and electrical rough-in are complete but before insulation and drywall go up. It is your only real chance to see the home’s bones. Bring a flashlight and your list of structural selections to confirm everything matches the plan.
2. Third-Party Inspection
Hiring your own licensed inspector, separate from any inspections the builder or municipality performs, is one of the highest-value few hundred dollars you will spend in this entire process. A third-party inspector works for you alone and has no incentive to smooth over a finding.
3. Blue Tape (Orientation) Walk
Scheduled close to completion, this walkthrough is where you and your builder mark cosmetic issues, paint touch-ups, a scuffed cabinet, a trim gap, with blue painter’s tape. This list becomes your punch list for final corrections before closing.
A Regional Note on What to Watch For
Homes built across Memphis and DeSoto County sit on clay-heavy soil and deal with a humid subtropical climate, which makes foundation grading, gutter drainage, and HVAC sizing worth extra attention during your pre-drywall walk. Ask your builder directly how the foundation was engineered for the specific lot’s soil conditions.
A second set of trained eyes catches what a walkthrough alone can miss. See what a pre-drywall and final inspection actually cover, and why timing them right protects your investment. Read our new construction inspection guide →
Step 6: What Happens at Closing on a New Construction Home?
Closing on new construction looks similar to a resale closing on paper, signed loan documents, a funded loan, a recorded deed, but it carries two extra steps resale buyers never deal with: confirming every punch-list item is finished and understanding exactly what your builder’s warranty covers.
Before You Sign: Confirm the Punch List Is Closed Out
Walk the home one more time before closing day and verify every item from your blue tape walk has actually been corrected, not just marked complete on paper. A builder in good faith will welcome this. Anything still outstanding should be documented in writing with a completion date attached, ideally before funds are released.
How New Construction Closing Costs Typically Compare to Resale
New construction closing costs often run similar to resale in percentage terms, but the line items differ: expect a warranty administration fee, a water/sewer tap fee in some municipalities, and sometimes an HOA initiation fee that resale buyers rarely encounter in the same combination.
Closing day brings a different set of fees than a resale purchase does. See a full breakdown of what to budget for before you get to the closing table. See our new construction closing costs guide →
Understanding Your Builder’s Warranty
Most production builders structure new home warranties in three tiers, and knowing the difference matters more than most buyers realize until something breaks.
- Workmanship warranty (typically 1 year): Covers fit-and-finish issues, like drywall cracks, door alignment, and paint
- Systems warranty (typically 2 years): Covers plumbing, electrical, and HVAC systems
- Structural warranty (typically 10 years): Covers load-bearing elements like the foundation and framing
Mark your calendar for a follow-up inspection roughly 60 days before your one-year workmanship warranty expires. That window is your best chance to catch and report anything the home has settled into since move-in.
What Should You Look for in a New Construction Builder?
The right builder for you is one whose finished communities you can walk through today, not just a rendering you are asked to trust. Ask how long they have operated in your market, how many homes they have completed, and whether their team includes in-house trades or relies entirely on rotating subcontractors.
We have built and developed more than 400 homes across Greater Memphis since 2014, and we would rather show you a finished street than a brochure. A builder with deep roots in one region understands that region’s soil, permitting offices, and weather patterns in ways a newcomer hasn’t had time to learn yet.
The best way to judge a builder is to see what they’ve already built and sold. Browse homes that are move-in ready right now across our Greater Memphis communities. View our available homes →
What Should You Do Next to Start the Process?
If you are still a few months out from being ready, start with pre-approval and a short list of communities you would actually want to live in. If you are closer to ready, the next conversation worth having is with a builder directly, so you can compare real floor plans and real availability against your budget.
- Get pre-approved, even if you are not buying for another six months
- Tour two or three finished communities in person before you fall in love with a floor plan online
- Ask every builder for references from buyers who closed in the last twelve months, not just testimonials on their website
- Bring a buyer’s agent with you to your very first model home visit, not your third
None of this locks you into anything. It just means that when you are ready to move, you move with real information instead of guesses.
Frequently Asked Questions
How Is Buying New Construction Different From Buying an Existing Home?
New construction follows a longer, staged timeline instead of a single closing event, and it involves decisions existing-home buyers never make, like structural options and finish selections. Earnest money, inspections, and even your agent’s role all work a little differently, which is why independent representation matters so much in this process.
Do I Still Need a Home Inspection If the Builder Already Inspects the Home?
Yes. A builder’s internal quality checks and a municipal inspection both serve the builder and the local code authority, not you specifically. A licensed third-party inspector works exclusively for you and has no incentive to overlook a finding, which makes this one of the few places in the process worth spending extra money without hesitation.
Is Earnest Money Refundable on a New Construction Home?
It depends entirely on your specific contract, and this is exactly why reading the deposit clause before signing matters. Many builder contracts make earnest money non-refundable once design selections are locked in, even if your financing later falls through, so ask this question directly before you put down a deposit.
How Long Does It Take to Close Once the Home Is Finished?
Once a home is essentially complete and your financing is in order, closing typically happens within two to four weeks. That window can stretch if your lender needs additional documentation or if punch-list items are still outstanding, which is one more reason to stay on top of your walkthroughs throughout construction.
What Does a Builder’s Warranty Actually Cover?
Most production builders offer a tiered warranty: roughly one year on workmanship items like paint and trim, two years on major systems like plumbing and HVAC, and up to ten years on structural elements like the foundation. Coverage details vary by builder, so ask for the written warranty document before closing, not after.
Can I Make Changes to the Floor Plan After I’ve Signed the Contract?
Minor changes are sometimes possible early in the selections window, but structural changes become difficult or impossible once framing begins, and late changes typically carry change-order fees. Lock in structural decisions first and treat the selections period as your real window for changes, not construction week.
Why Meridian Premier Homes Is the Right Partner for Your New Construction Journey
Buying new construction rewards buyers who understand the process before they start. The stages are predictable, the paperwork is learnable, and the timeline, while longer than most people expect, is manageable once you know what each phase requires of you.
We have spent more than a decade building across Greater Memphis, in TN and MS communities families still live in today, and that track record is the clearest answer to the question every buyer eventually asks: can this builder see the job through? A finished street says more than any sales pitch can.
Ready to talk through where you are in the process? Contact our team →